New LED inventory takes the wall count past 9,000 m²
Curved cabinets, walkable floor panels and a second processing rack arrived in Al Quoz this month — and the test wall is already…
Read the note
Productions, technical notes and studio updates from the team.
Curved cabinets, walkable floor panels and a second processing rack arrived in Al Quoz this month — and the test wall is already…
Read the noteA Riyadh technology conference with eight session rooms, a plenary stream and an exhibition floor that all had to start on the sa…
Read the noteNine riggers requalified this month, and the inspection routine they brought back is now the standard on every flown build.
Read the noteA second depot in Riyadh means KSA builds can be prepped in-country instead of trucked in the week before the show.
Read the noteTwo stages, four nights and a desert site where the wind is a production department of its own.
Read the noteWe weighed what left the site for four nights. The result changed how we pack, and it is feeding the ISO 20121 work.
Read the noteArabic and English show notes are not a translation exercise — they are two documents written for two crews doing the same job.
Read the noteScreens, sound and a concert stage across a circuit where the sport always goes first and the schedule is written in minutes.
Read the noteLighting, audio, LED, rigging, production and warehouse roles are open in Dubai, Riyadh and Doha as the calendar extends.
Read the noteCommentators no longer have to be in the building: four flyaway kits with clean feeds, mix-minus and a redundant return path.
Read the note